Never got above 11c in the house...even with the fire going...I need a bigger Fire !!
Did a number of small jobs ...
- Fitted the weather bar to the base of the new back door
- Another coat of limewash on the Library chimney wall (another 2 or 3 should do it)...se photo below.
- Cleared the area around the outside entrance to the Cellar.. I will need to get a wheelbarrow to this entrance when the major cellar project begins, after Christmas.
- Jan put the first coat of paint on the new dining table (Paint effects are a mystery to me !)
- Jan also put the first coat of paint (grey again!!) on the back door.
- Delivered the new chairs we found in the local second hand junk shop..
Photos of the cellar...before I start the major project
The hole in the library floor (this will be a trapdoor when finished).
trenches for the perforated pipe...to drain the water
The joists are shot in that corner, so an Acro Prop is required for now.
No comments: