BlaenCwmBychan

BlaenCwmBychan

Sunday 27 April 2014

Hall and Landing finished ! (apart from decorating)

A very wet (and rather chilly) Saturday, but a lovely Sunday.

I spent Saturday fitting architrave and skirting in Alys' bedroom, looks great but also allows the next step of finishing the liming in that room. Also I de-nailed the ceiling joists of the old plasterboard nails, getting it ready to start fitting the ceiling bisquit board next time...That took all Saturday afternoon.
Meanwhile Jan painted the hall cladding....looks great, really lightens the hallway.
A chilly evening, but the house looked wet, but lovely...
Sunday, I limed the landing ceiling, hard work, but not as difficult as liming in between the joists( in Owens bedroom and the hallway). The finish is "rough and ready", but i like it. I feel encouraged that I can do this in Alys' bedroom ceiling and in the Inglenook room(sometime soon). Jan continued to paint the skirting and architraves...looks amazing.. looks.finished !! Also limewashed the hall walls (first coat), softer and lighter already.

Lastly, I had a go at the end-wall in Alys' bedroom. We are not going to Lime render this, but Limewash it (as in Owen's room, and Tom's attic room). Its going to be more of a challenge as it looks as though smoke from the fireplace has stained the wall. So I scrubbed the stonework and raked out the pointing. then used the remaing lime from the Landing ceiling to dub-in what i could (did about half of the wall).

Hopefully this will look a little different in the future :)




No comments:

Post a Comment